Monday, September 14, 2020

Project-Zero: Sorting out diff mounting.


Some notes:
  • The installation Order of Operations for the diff are
    • Loosely install lower rear cross-bolt and spacers in the differential.
    • Lift differential in to cat nose/flange first, loosely bolt-in the nose.
    • Lift differential rear, insert the upper rear bolt.
    • Torque everything to spec.
  • Spacers are required:
    • After a little trial and error I found that I need 15mm spacers.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.