Tuesday, August 25, 2020

Project-Zero: Build VLog 8.24.2020

 

Since Saturday I've done three timeboxed build sessions on the GBS Zero. One 90 minute timebox on Sunday morning, two 60 minute timeboxes on Monday after and evening.  Only have timelapse of one of the Monday timeboxes.

  • Front hubs have been installed.
  • Front brakes have been assembled and installed.
  • Front shocks have been installed.
  • Steering rack has been installed.
  • Tie-rods have been installed.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.